Granny Flat Cost Calculator: Estimate Your 2026 Build Price

A granny flat cost calculator helps you organise assumptions before you have complete quotes. It cannot inspect your land, locate services or establish current supplier prices. Use TGFG’s result as an illustrative planning scenario, then replace the assumptions with evidence for your address.
We do not have completed-project data that establishes a percentage accuracy for this tool. The former claim that results were usually within 10–15% of a quote has been withdrawn. A precise-looking total is still an estimate if its inputs are allowances.
Understand the categories behind the total
The calculator groups the project into preliminaries, site costs, the build and finishes. Those categories help expose work that a headline kit or module price may exclude. They are not evidence that every project spends a particular percentage on each phase.
| Category | Evidence to collect |
|---|---|
| Preliminaries | Design and report quotes, the approval route, practitioner fees and relevant authority charges |
| Site costs | Foundation design, access assessment, earthworks and service-connection quotes |
| Build | The supplier’s contract scope, specification and exclusions |
| Finishes | Installed prices for items outside the building contract, with overlap removed |
A complete module at the factory can still leave delivery and site installation unpaid. A materials kit leaves more construction to arrange. Compare those purchases using the dated supplier example in our cost guide.
Start with a defined project
Choose the intended build type, floor area and specification, then check the site assumptions. If you don’t know the slope, foundation requirements or available connection points, record that uncertainty beside the result. Guessing those inputs more confidently does not improve the evidence.
Check the intended area and planning route before commissioning a supplier quote. The NSW secondary dwelling guidance, for example, explains pathway conditions; it does not supply a construction price. Other states have different frameworks.
Save the assumptions with the date and plan revision. When you change the design, review the scope rather than simply increasing one total. A larger bathroom might affect foundations, services and fit-out, not just floor area.
Use arithmetic without turning it into a market claim
Hypothetical example: suppose a supplier contract is $150,000, separately quoted work is $25,000 and an unresolved allowance is $10,000. The provisional project total is $185,000 before any additional reserve you choose for identified risks. These invented amounts demonstrate addition; they are not prices for a particular size or suburb.
Next, check whether any of the separately quoted work is already included in the supplier contract. If $5,000 of electrical work appears in both, reconcile it before comparing the budget with another proposal. Conversely, a missing delivery quote should remain an open item rather than silently become zero.
Keep a column for the basis of each amount: fixed quote, provisional allowance or not yet priced. Our cost breakdown helps organise those records.
Investigate what moves the result
Change one assumption at a time to understand the tool’s sensitivity. That exercise shows how the model behaves; it does not establish the real cost of a retaining wall or sewer connection. Request the relevant site assessment and quote before relying on that line.
If the project only appears affordable when every uncertain item is at its lowest allowance, identify which quotes you need before committing. Ask the supplier what its price assumes about access, ground conditions and owner-supplied work. Read the quote comparison guide to align competing scopes.
Move from a scenario to a documented budget
Send the same brief to suitable suppliers, with the address and available survey information. Request inclusions, exclusions, expiry dates and payment stages. Keep GST treatment consistent across quotes and ask who pays for design or approval changes.
Review the resulting budget with the people responsible for design and construction. A calculator result is not a contract price, finance approval or property valuation. If borrowing, give the lender the actual project documents. Browse the supplier hub once you know which supply scope you want.
Frequently Asked Questions
Is the calculator free?
Yes. The on-page calculator is free to use and does not require a sign-up.
Does it establish the average Australian build cost?
No. Its assumptions are not a verified national dataset of completed projects.
Are approval allowances the fees I will pay?
No. Obtain the current charges and professional quotes for your property and approval route.
By The Granny Flat Guide Team. Last updated October 2026. About our research · Project budget calculator
How much does council approval add to your build budget?
Council and certifier fees sit outside the builder quote. In NSW, a CDC pathway through a private certifier often lands between roughly $3,000 and $8,000 once survey, BASIX and Sydney Water checks are included, while a full DA can cost more because of longer consultant time and holding costs. Victoria and Queensland use different fee schedules, so treat any single number as a starting point. Model your own project in our cost calculator, then browse the supplier hub or send us an enquiry when your footprint is settled.
What design choices affect approval speed?
Setbacks, height, floor area and tree protection overlays decide whether you stay on a fast CDC track or drop to a slower DA. Staying under common 60 sqm internal caps, keeping adequate side and rear setbacks and connecting services without major easement conflicts usually keeps the pathway simpler. If your block is sloped, flood-affected or heritage-listed, expect extra reports before council or your certifier can sign off. Use the setback checker and approval wizard against your address before you pay for custom drawings.
Primary sources
These cards are an editorial summary of official pages. The Granny Flat Guide is not a certifier, council or licensed builder. Check the live official URL before you lodge or sign.
- Your Home (Australian Government)Your Home: Australia's guide to environmentally sustainable homes
- Australian Building Codes BoardNational Construction Code
- NSW Planning PortalState Environmental Planning Policy (Housing) 2021
- Victorian Building AuthorityBuilding Act 1993 / small second dwelling settings
- Queensland PlanningPlanning Act 2016
- WA Planning (DPLH)Planning and Development Act 2005
- PlanSA (South Australia)Planning, Development and Infrastructure Act 2016
- QBCC (Queensland)Queensland Building and Construction Commission licensing
See our editorial standards for how we research and update guides.