NCC 7-star energy requirements for granny flats depend on the code edition, jurisdictional variations and compliance pathway that apply to the project. A NatHERS thermal rating and a whole-of-home energy assessment answer different questions. Ask your building practitioner to identify the required method before ordering windows or a kit.

The useful question is not whether a brochure carries a seven-star claim. It is whether the documents cover your dwelling, orientation, climate location and specified construction. Keep those details consistent from the design assessment through to installation.

Choose the compliance pathway before the specification

NCC 2022 Volume Two Part H6 describes NatHERS and elemental Deemed-to-Satisfy routes, subject to its conditions and jurisdictional variations. NatHERS is therefore not the only method described in that edition. Confirm which route is accepted for your project and which documents demonstrate it.

The code’s publication year is not enough to establish the applicable rules. States and territories have adoption arrangements and variations. Your certifier or building surveyor should record the edition and relevant provisions, including any transition that applies. For background, see our NCC 2022 changes guide.

Separate thermal performance from energy for appliances

On a NatHERS pathway, the thermal assessment considers how the dwelling’s design responds to its climate. Glazing, orientation, insulation and shading are part of that design. The whole-of-home assessment considers relevant equipment and energy systems. Read the NatHERS guidance with your assessor to understand the documents you receive.

Don’t treat a solar-panel quote as a substitute for the required building-fabric assessment. Ask the assessor to explain which design changes affect thermal performance and which affect the services assessment. That distinction makes it easier to compare a window upgrade with a change to hot-water equipment.

Keep the equipment assumptions with the building specification. If the quoted appliance differs from the assessed model or performance, have the change checked before purchase.

Resolve glazing and shading while plans can change

Put the proposed dwelling on the actual site plan. Record orientation, nearby obstructions and the intended window sizes. A display model rotated to fit your yard can behave differently from the version in the brochure.

Ask for design options while the drawing is still flexible. For example, the assessor may compare a smaller window, different glazing or external shading. Compare the installed price and how each option affects daylight, outlook and ventilation. Don’t choose solely by the lowest glass supply price.

The Your Home glazing guidance explains why climate and orientation matter. It is a design resource, not a compliance certificate for your address.

Check what the construction quote actually includes

ItemQuestion for the quote
AssessmentWho prepares it, for which design revision, and are revisions included?
WindowsDoes the quoted product match the specified performance and opening sizes?
Insulation and thermal breaksAre the required products and installation details included in the construction scope?
Ventilation and moisture detailingWho coordinates exhaust, membranes and roof or wall details with the design?
EquipmentAre the assessed heating, cooling and hot-water assumptions reflected in the quote?

Record exclusions in the project budget. An allowance marked “energy compliance” needs enough detail to establish what you are buying and what remains unpriced.

Keep changes and completion records together

During construction, check proposed substitutions with the responsible practitioner. A different window, roof finish or appliance can require the assessment or drawings to be updated. Obtain approval for the change before installation, and circulate the revised specification.

At handover, collect the documents required for your approval and keep them with warranties and the final plans. Your practitioner should identify outstanding items before you arrange occupation. For factory-built units, our prefab certification guide separates supplier documentation from site responsibilities.

Electricity billing is a separate design question. If two households need separate accounts or consumption records, discuss that with the electrician and retailer; see our electricity meter guide.

Frequently Asked Questions

Must every existing granny flat be upgraded to seven stars?

Don’t infer a retrospective requirement from a new-building rule. Ask the practitioner what requirements are triggered by the particular alteration or new work.

Does a factory-built dwelling avoid the energy assessment?

Factory manufacture does not establish compliance at the installation address. Confirm the pathway and documentation for the proposed dwelling and site.

Can I use the certificate from a display home?

Only if the responsible practitioner confirms that the documentation applies to your project. Location, orientation, specification and plan changes need checking.

By The Granny Flat Guide Team. Last updated October 2026. About our research · Project budget calculator

How much does council approval add to your build budget?

Council and certifier fees sit outside the builder quote. In NSW, a CDC pathway through a private certifier often lands between roughly $3,000 and $8,000 once survey, BASIX and Sydney Water checks are included, while a full DA can cost more because of longer consultant time and holding costs. Victoria and Queensland use different fee schedules, so treat any single number as a starting point. Model your own project in our cost calculator, then browse the supplier hub or send us an enquiry when your footprint is settled.

What design choices affect approval speed?

Setbacks, height, floor area and tree protection overlays decide whether you stay on a fast CDC track or drop to a slower DA. Staying under common 60 sqm internal caps, keeping adequate side and rear setbacks and connecting services without major easement conflicts usually keeps the pathway simpler. If your block is sloped, flood-affected or heritage-listed, expect extra reports before council or your certifier can sign off. Use the setback checker and approval wizard against your address before you pay for custom drawings.

Primary sources

These cards are an editorial summary of official pages. The Granny Flat Guide is not a certifier, council or licensed builder. Check the live official URL before you lodge or sign.

  • Your Home (Australian Government)Your Home: Australia's guide to environmentally sustainable homesJurisdiction: Australia · Effective: Living resource (check current page) · Checked on: 2026-09-02 · Layer: editorial summary
  • Australian Building Codes BoardNational Construction CodeJurisdiction: Australia · Effective: NCC 2022 (confirm current edition) · Checked on: 2026-09-02 · Layer: building approval
  • NSW Planning PortalState Environmental Planning Policy (Housing) 2021Jurisdiction: NSW · Effective: 2021 consolidation (confirm current) · Checked on: 2026-09-02 · Layer: planning approval
  • Victorian Building AuthorityBuilding Act 1993 / small second dwelling settingsJurisdiction: Victoria · Effective: Confirm current VBA guidance · Checked on: 2026-09-02 · Layer: building approval
  • Queensland PlanningPlanning Act 2016Jurisdiction: Queensland · Effective: Confirm current QLD planning page · Checked on: 2026-09-02 · Layer: planning approval
  • WA Planning (DPLH)Planning and Development Act 2005Jurisdiction: Western Australia · Effective: Confirm current DPLH page · Checked on: 2026-09-02 · Layer: planning approval
  • PlanSA (South Australia)Planning, Development and Infrastructure Act 2016Jurisdiction: South Australia · Effective: Confirm current PlanSA page · Checked on: 2026-09-02 · Layer: planning approval
  • QBCC (Queensland)Queensland Building and Construction Commission licensingJurisdiction: Queensland · Effective: Confirm current QBCC page · Checked on: 2026-09-02 · Layer: building approval

See our editorial standards for how we research and update guides.

About The Granny Flat Guide

Independent Australian research on secondary dwellings and backyard housing. We publish cost guides, council rules and supplier reviews. We are not a builder. See our editorial standards.



Work Out Your Real Budget

Use our free on-page cost calculator to estimate preliminaries, site costs, the build and finishes. Results update instantly in your browser.

Open the Cost Calculator

Planning tools

Approval wizard, setback checker and build-type comparator in one place.

Open planning tools

Send a project enquiry

Your message comes to us. We don’t pass your details to any listed builder or supplier.

Send an enquiry